| Week | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | Sunday |
| 7th-13th January | Monday morning meeting 10am
-Meet with designer |
DRA
-Meeting for Aether at 12pm -Research for Aether -Organise folder -Look at Whaley’s fabrics |
-dissertation
-reading -research at uni |
-dissertation
|
-dissertation
GO TO ANDOVER (metal work) |
-dissertation | -dissertation
BOURNEMOUTH |
| 14th-20th January | Monday morning meeting 10am
-dissertation -go to Weymouth (fabric sourcing) ITCHY FEET
|
DRA
-dissertation |
-Go to London (fabric sourcing)
-refine dissertation |
-finish dissertation
|
I.S. Handin- 11.30-12pm
-meet designer after handin |
||
| 21st-27th January | Monday morning meeting 10am
|
DRA
-Workshop session -Meet with designer |
-Go to workshop
– look at Bennett Silks samples
|
-Make cardboard mock-up for neckpiece | Go back to Andover (metal sampling) | -Metal sampling | -Metal sampling
Bournemouth |
| 28th January- 3rd February | Monday morning meeting 10am
10.30-4.30 studio session with tutorials -produce mock-up cardboard costume for designer to see
|
DRA
-research undergarment construction |
-Experiment with undergarment construction | Costume history lecture 9-10am
|
-Finish time-plan and learning agreement
-embroidery research |
Portsmouth to collect metal | Andover (metalwork) |
| 4th – 10th February | Monday morning meeting 10am
Learning agreement handin London for measurements |
DRA
PPP briefing & guest lecturer 1.30-3.30pm -draft underwear blocks -pad mannequin |
-make underwear toile | -finish underwear toile
|
Studio closed
-Make dress toile |
-Make cardboard mock-up for neck piece and head piece (fittings standard) | -Attach triangle to underwear toile |
| 11th-17th February | Monday morning meeting 10am
FITTINGS WEEK |
DRA
FITTINGS WEEK -Make triangles for undergarment |
FITTINGS WEEK
-Make dress |
FITTINGS WEEK
|
Results back for IS
FITTINGS WEEK Andover- make prisms |
FITTINGS WEEK
Andover- make prisms |
FITTINGS WEEK
Andover- make prisms |
| 18th-24th February | Monday morning meeting 10am
Marketing- Graduation -construct underwear |
DRA
9.30-12.30 dye room workshops PPP Guest speaker 1.30-3.30 UH001 -Finish underwear and start adding triangles |
-More triangles for undergarment | Costume history lecture 9-10am
10-12.30 Digital workshop 1.30-4.30 sign up session -Continue working on undergarment
|
-continue working on undergarment | Andover- drill holes | Andover- drill holes |
| 25thFebruary- 3rd March | Monday morning meeting 10am
-Start constructing metalwork
|
DRA (morning only)
Poirot photoshoot PPP Jane Law costumier UH001 1.30-3pm |
-metalwork
|
-metalwork
|
-metalwork
|
||
| 4th-10th March | Monday morning meeting 10am
Receive designs for The Threepenny Opera 10-11am Student perception survey |
DRA
Dye room sessions 9.30-12.30 -Embroidery Portfolio layout tutorials 1.30-4.30 F102 |
-Embroidery
FITTINGS WEEK
|
-Embroidery
FITTINGS WEEK
|
Unit mid way point
-Embroidery FITTINGS WEEK
|
-finishings
FITTINGS WEEK
|
-finishings
FITTINGS WEEK
|
| 11th-17th March | Monday morning meeting 10am
-finishings |
-finishings | -finishings | FILMING
DRA?
|
FILMING
|
FILMING
|
FILMING
|
| 18th-24th March | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS (21) |
| 25th-31st March | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS | EASTER HOLIDAYS |
| 1st-7th April | Bank holiday
Draft jacket |
Exhibition planning
Draft pattern |
Uni 9.30AM
Adapt pattern for jacket, draft collar and adapt sleeves |
DRA
Tack bodysuit ready for overlocking |
Overlock bodysuit
Mark out pattern for bodysuit with shirring elastic |
Cut out jacket, mark tack and start to sew together | Sew jacket together |
| 8th-14th April | Monday morning meeting 10am
Sew jacket together |
9.30-4.30 F102 Creating a successful CV
Fitting at 1.30 3.30- 5pm CV tutorial |
Adaptations after fitting | 11am photoshoot | |||
| 15th-21st April | Monday morning meeting 10am
Submit exhibition request form |
Stretch stitch samples | Adapt sleeve
Cut sleeve Reinforce stitching of undergarment for Aether |
Reinforce stitching of undergarment
Make removable gusset Go to Andover |
London
Fabric shopping for chiffon skirt Decorative stitching for undergarment |
Decorative stitching
Wash fabric |
Cut out collar
Make collar |
| 22nd-28th April | Monday morning meeting 10am
Stretch stitch samples |
Aether shoot
Photoshoot Wrap party |
Whitework
Stitch fronts to back (coat) |
Blog | Whitework/make accessories/ blog | Samples | Blog |
| 29th April- 5th May | Monday morning meeting 10am
Stitch apron together |
E120
Linda tutorial 10am Fitting for 3PO |
Cut out fabric for Aether dress | Start stitching dress together
Photoshoot for 3PO |
Tack seams ready for French | French seams | Cut bias binding |
| 6th-12th May | Bank holiday
Bias bind top and leave to hang |
Amended request form | Finalise portfolio | 12.30 mock interviews (F004, UH001) | Hem dress | ||
| 13th– 19th May | PPP Handin 11.30-12
Label, description and diagram for PPP |
DRA | |||||
| 20th-26th May | Monday morning meeting 10am
Final tutorials |
EMP Handin 11.30-12 | 3pm Assessment presentations | The Threepenny Opera | |||
| 27th May- 2nd June | Hand-in for Threepenny |
